The Bowen Road Watermain Replacement project is located in the north end of the Bridgeburg community on the east side of the Town of Fort Erie along the shores of the Niagara River. The project area is located along Bowen Road from Central Avenue to Niagara Boulevard. A risk analysis of this area was conducted through the Town's Asset Management Plan. The results of the risk analysis recommended the replacement of the existing 100mm diameter cast iron watermain along Bowen Road from Central Avenue to Niagara Boulevard. The general scope for this project includes the following: |