Point Abino Road South Reconstruction and Shoreline Protection
Share Point Abino Road South Reconstruction and Shoreline Protection on FacebookShare Point Abino Road South Reconstruction and Shoreline Protection on TwitterShare Point Abino Road South Reconstruction and Shoreline Protection on LinkedinEmail Point Abino Road South Reconstruction and Shoreline Protection link
In October of 2019 and again in December of 2022 the Lake Erie shoreline in southern Ontario experienced a sudden, unprecedented and extraordinary weather event including intense rain, snow and high winds. During these storm events the Point Abino Road South area experienced a high level of damage.
The Town applied for Municipal Disaster Recovery Assistance (MDRA) and received approval totaling $7,215,000 in late December of 2021 with $3,284.700 of these funds scheduled for the reconstruction of the damaged portion of the roadway and shoreline on Point Abino Road South.
The Town of Fort Erie has initiated engineering design services for the Point Abino Road South Reconstruction Project. Point Abino Road South is a rural road located in the south western portion of the Town of Fort Erie along the shores of Lake Erie.
The project limits begin approximately 250 metres south of Erie Road and end at Abino Hills Road. The general scope of design for this project includes the following elements:
Full road reconstruction
Rebuild and replace shoreline protection wall to withstand future extreme weather events
Replacement approximately 900m of existing watermain and services to property line
In October of 2019 and again in December of 2022 the Lake Erie shoreline in southern Ontario experienced a sudden, unprecedented and extraordinary weather event including intense rain, snow and high winds. During these storm events the Point Abino Road South area experienced a high level of damage.
The Town applied for Municipal Disaster Recovery Assistance (MDRA) and received approval totaling $7,215,000 in late December of 2021 with $3,284.700 of these funds scheduled for the reconstruction of the damaged portion of the roadway and shoreline on Point Abino Road South.
The Town of Fort Erie has initiated engineering design services for the Point Abino Road South Reconstruction Project. Point Abino Road South is a rural road located in the south western portion of the Town of Fort Erie along the shores of Lake Erie.
The project limits begin approximately 250 metres south of Erie Road and end at Abino Hills Road. The general scope of design for this project includes the following elements:
Full road reconstruction
Rebuild and replace shoreline protection wall to withstand future extreme weather events
Replacement approximately 900m of existing watermain and services to property line
Page last updated: 22 Aug 2023, 10:14 AM
Lifecycle
Phase 1 - Engage public for feedback within project area.
Point Abino Road South Reconstruction and Shoreline Protection is currently at this stage
Monday, March 27, 2023 to Friday April 07, 2023
Phase 2 - Finalize design and prepare tender documents
this is an upcoming stage for Point Abino Road South Reconstruction and Shoreline Protection
Phase 3 - Award of Tender
this is an upcoming stage for Point Abino Road South Reconstruction and Shoreline Protection
Phase 4 -Construction start
this is an upcoming stage for Point Abino Road South Reconstruction and Shoreline Protection
Phase 5 - Construction Complete
this is an upcoming stage for Point Abino Road South Reconstruction and Shoreline Protection