The Town of Fort Erie has initiated engineering design for the Bowen Road Watermain Replacement Project. The Bowen Road Watermain Replacement project is located in the north end of the Bridgeburg community on the east side of the Town of Fort Erie along the shores of the Niagara River. The project area is located along Bowen Road from Central Avenue to Niagara Boulevard. A risk analysis of this area was conducted through the Town's Asset Management Plan. The results of the risk analysis recommended the replacement of the existing 100mm diameter cast iron watermain along Bowen Road from Central Avenue to Niagara Boulevard. The general scope for this project includes the following: |
Virtual Public Consultation
This online public consultation provides residents with the opportunity to review the associated documents relating to the project and provide feedback on this project prior to construction.
Please review the documents included on the right hand side of this page and complete the survey. We would like to hear your thoughts and concerns on this project prior to construction.
A question submission period will open from Monday, August 25, 2025 to Friday, September 5, 2025.