Public Consultation for Lindbergh Drive and Burbank Terrace Infrastructure Improvements

Share Public Consultation for Lindbergh Drive and Burbank Terrace Infrastructure Improvements on Facebook Share Public Consultation for Lindbergh Drive and Burbank Terrace Infrastructure Improvements on Twitter Share Public Consultation for Lindbergh Drive and Burbank Terrace Infrastructure Improvements on Linkedin Email Public Consultation for Lindbergh Drive and Burbank Terrace Infrastructure Improvements link

Consultation has concluded

The Lindbergh Drive and Burbank Terrace area is located in the Bridgeburgh section of Fort Erie that extends from Burbank Terrace to Burns Place and Bowen Road to Lindbergh Drive.

A risk analysis of this area was conducted through the Town's Asset Management Plan.

The results of the risk analysis showed that that these sections of Lindbergh Drive (about 730m) and Burbank Terrance (about 100m) required the following work:

Lindbergh Drive from Burbank Terrace to Burns Place

  • Replacement of the existing 150 mm diameter asbestos cement watermain with 150 mm diameter PVC watermain, including replacement of all services up to/including curb stops,
  • Improvement to the stormwater drainage works, including new storm sewers, roadside swales and ditches with catchbasin outlets
  • Replacement of the existing 300 mm diameter asbestos cement sanitary sewer, including replacement/relining of laterals up to property limits,
  • Full reconstruction of Lindbergh Drive from Burbank Terrace to Burns Place with shoulders

Burbank Terrace from Bowen Road to Lindbergh Drive

  • Replacement of the existing 100 mm diameter asbestos cement watermain with 150 mm diameter PVC watermain, including replacement of all services up to/including curb stops,
  • Improvement to the stormwater drainage works, including new storm sewers, roadside swales and ditches with catchbasin outlets
  • Installation of new 300mm diameter PVC sanitary sewer, including replacement of laterals up to property limits,
  • Full reconstruction of Burbank Terrace from Bowen Road to Lindbergh Drive with shoulders

Virtual Public Consultation

This online public consultation provides residents with the opportunity to review the associated documents relating to the project and provide feedback on this project prior to construction.

Please review the documents included on the right hand side of this page and complete the survey. We would like to hear your thoughts and concerns on this project prior to construction.

A question submission period will open from Tuesday, May 30, 2023 to Friday, June 9, 2023 .

The Lindbergh Drive and Burbank Terrace area is located in the Bridgeburgh section of Fort Erie that extends from Burbank Terrace to Burns Place and Bowen Road to Lindbergh Drive.

A risk analysis of this area was conducted through the Town's Asset Management Plan.

The results of the risk analysis showed that that these sections of Lindbergh Drive (about 730m) and Burbank Terrance (about 100m) required the following work:

Lindbergh Drive from Burbank Terrace to Burns Place

  • Replacement of the existing 150 mm diameter asbestos cement watermain with 150 mm diameter PVC watermain, including replacement of all services up to/including curb stops,
  • Improvement to the stormwater drainage works, including new storm sewers, roadside swales and ditches with catchbasin outlets
  • Replacement of the existing 300 mm diameter asbestos cement sanitary sewer, including replacement/relining of laterals up to property limits,
  • Full reconstruction of Lindbergh Drive from Burbank Terrace to Burns Place with shoulders

Burbank Terrace from Bowen Road to Lindbergh Drive

  • Replacement of the existing 100 mm diameter asbestos cement watermain with 150 mm diameter PVC watermain, including replacement of all services up to/including curb stops,
  • Improvement to the stormwater drainage works, including new storm sewers, roadside swales and ditches with catchbasin outlets
  • Installation of new 300mm diameter PVC sanitary sewer, including replacement of laterals up to property limits,
  • Full reconstruction of Burbank Terrace from Bowen Road to Lindbergh Drive with shoulders

Virtual Public Consultation

This online public consultation provides residents with the opportunity to review the associated documents relating to the project and provide feedback on this project prior to construction.

Please review the documents included on the right hand side of this page and complete the survey. We would like to hear your thoughts and concerns on this project prior to construction.

A question submission period will open from Tuesday, May 30, 2023 to Friday, June 9, 2023 .

  • CLOSED: This survey has concluded.

    We want to hear from you! 

    Please take a few minutes to complete our short survey. Your feedback is important to us!

    Please note that information will be collected in accordance with the Municipal Freedom of Information and Protection of Privacy Act. With the exception of personal information, please note all comments will become part of the public record.

    Consultation has concluded
    Share Lindbergh Drive and Burbank Terrace Infrastructure Improvements - Resident Survey on Facebook Share Lindbergh Drive and Burbank Terrace Infrastructure Improvements - Resident Survey on Twitter Share Lindbergh Drive and Burbank Terrace Infrastructure Improvements - Resident Survey on Linkedin Email Lindbergh Drive and Burbank Terrace Infrastructure Improvements - Resident Survey link