The Nigh Road Watermain project area is located along Nigh road from Ridge Road North to Prospect Point Road North. The Water Distribution System Master Plan recommended the installation of a new watermain to link the existing dead-end watermain on Prospect Point Road North to the existing watermain on Ridge Road North. The results of the Water Distribution System Master Plan showed that looping the watermain will have a positive effect on water quality and reduce the need to flush the dead-end watermain.
The Nigh road watermain extension will consist of the following work:
• Installation of new 150mm diameter PVC watermain along Nigh Road North side of the Town right of way, including replacement of existing hydrants and watermain valves.
• Road Resurfacing of Nigh Road from Prospect Point Road North to Ridge Road North with granular shoulders.
• Pavement Markings
Virtual Public Consultation
Due to the COVID-19 pandemic, the Town is moving away from traditional, in-house, public consultations and is transitioning to host our Public Consultations online. This online public consultation provides residents with the opportunity to provide feedback about the results of the study conducted.
A question submission period will open until August 17, 2021.
The Nigh Road Watermain project area is located along Nigh road from Ridge Road North to Prospect Point Road North. The Water Distribution System Master Plan recommended the installation of a new watermain to link the existing dead-end watermain on Prospect Point Road North to the existing watermain on Ridge Road North. The results of the Water Distribution System Master Plan showed that looping the watermain will have a positive effect on water quality and reduce the need to flush the dead-end watermain.
The Nigh road watermain extension will consist of the following work:
• Installation of new 150mm diameter PVC watermain along Nigh Road North side of the Town right of way, including replacement of existing hydrants and watermain valves.
• Road Resurfacing of Nigh Road from Prospect Point Road North to Ridge Road North with granular shoulders.
• Pavement Markings
Virtual Public Consultation
Due to the COVID-19 pandemic, the Town is moving away from traditional, in-house, public consultations and is transitioning to host our Public Consultations online. This online public consultation provides residents with the opportunity to provide feedback about the results of the study conducted.
A question submission period will open until August 17, 2021.
Share Location of construction on Nigh Road on FacebookShare Location of construction on Nigh Road on TwitterShare Location of construction on Nigh Road on LinkedinEmail Location of construction on Nigh Road link
Nigh Road Watermain Extension has finished this stage
This consultation is open for contributions.
Under Review
Nigh Road Watermain Extension has finished this stage
Contributions to this consultation are closed for evaluation and review. The project team will report back on key outcomes.
Final report
Nigh Road Watermain Extension has finished this stage
The final outcomes of the consultation are documented here. This may include a summary of all contributions collected as well as recommendations for future action.
Construction Begins
Nigh Road Watermain Extension has finished this stage
October 29, 2021
Construction Progress
Nigh Road Watermain Extension has finished this stage
100% completion.
Construction Finished
Nigh Road Watermain Extension is currently at this stage
Project is in one year maintenance.
Deficiencies to be determine at one year maintenance inspection.